[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fQj8sujP2kOQAApreNnCwNSOJBScvFIpbgn5NTbEK944":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":15,"related":16,"source":26,"type":27},[],"2023-11-27 13:18:03",995309692,[8,9,10,11],"38","40","42","44",{"courseImg":13,"courseName":14},"https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002Fbede9341815d462081f6947c0e9e0152.jpg","工程施工组织设计","某工程由支模板、绑纲筋、浇筑混凝土 3 个分项工程组成 , 它在平面上划分为 6 个施工段 ,该 3 个分项工程在各个施工段上流水节拍依次为 6 天、 4 天和 2 天 , 则其工期最短的流水施工方案为( ) 天",[17,28,37,46,56,65,75,83,88,93],{"answer":18,"createTime":5,"id":19,"options":20,"question":25,"source":26,"type":27},[],995309529,[21,22,23,24],"施工组织总设计","单位工程施工组织设计","分部分项工程施工组织设计","专项施工组织设计","以一个施工项目为编制对象,用以指导整个施工项目全过程的各项施工活动的技术、经济和组织的综合性文件叫( )","v2",0,{"answer":29,"createTime":5,"id":30,"options":31,"question":36,"source":26,"type":27},[],995309535,[32,33,34,35],"流水强度","时间定额","流水节拍","流水步距","每个专业工作队在各个施工段上完成其专业施工过程所必需的持续时间是指( )",{"answer":38,"createTime":5,"id":39,"options":40,"question":45,"source":26,"type":27},[],995309643,[41,42,43,44],"20","21","22","23","某分部工程有3个施工过程,分为4个施工段组织流水施工.各施工过程的流水节拍分别为3、5、4、3天,3、4、4、2天和4、3、3、4天,则流水施工工期为 ( ) 天",{"answer":47,"createTime":5,"id":48,"options":49,"question":54,"source":26,"type":55},[],995309647,[50,51,52,53],"施工过程时间组织","施工过程空间组织","施工过程机械组织","施工过程人员组织","施工组织设计包括( )",1,{"answer":57,"createTime":5,"id":58,"options":59,"question":64,"source":26,"type":55},[],995309651,[60,61,62,63],"单施工段多工序型","多施工段多工序型","混合型","综合型","公路施工过程时间组织的类型主要有( )",{"answer":66,"createTime":5,"id":67,"options":68,"question":74,"source":26,"type":55},[],995309655,[69,70,71,72,73],"没有充分地利用工作面进行施工,工期长","如果按专业成立工作队,则各专业队不能连续作业","施工现场的组织管理工作比较复杂","单位时间内投入的资源量较少,有利于资源供应的组织","相邻两个专业工作队能够最大限度地搭接作业","建设工程组织依次施工时,其特点包括( )",{"answer":76,"createTime":5,"id":77,"options":78,"question":81,"source":26,"type":82},[],995309660,[79,80],"对","错","施工过程依次划分为:动作与操作、工序、操作过程.( )",3,{"answer":84,"createTime":5,"id":85,"options":86,"question":87,"source":26,"type":82},[],995309664,[79,80],"施工组织设计包括两方面:一施工过程时间组织,二施工过程空间组织.( )",{"answer":89,"createTime":5,"id":90,"options":91,"question":92,"source":26,"type":82},[],995309668,[79,80],"公路施工的空间组织有三种基本作业方法:顺序作业法、平行作业法、流水作业法 .( )",{"answer":94,"createTime":5,"id":6,"options":95,"question":15,"source":26,"type":27},[],[8,9,10,11]]