[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fXDfkZXKH776djU-MqSubzkfFpsMUhAsQwR_b_1MT4k4":3},{"answer":4,"createTime":5,"id":6,"options":7,"origin":12,"question":15,"related":16,"source":26,"type":27},[],"2024-10-19 01:30:46",999187486,[8,9,10,11],"考虑施工费用和施工损耗","考虑施工费用和施工损耗、型钢的使用费","仅考虑施工费用和施工损耗,定额未包括型钢的使用费","考虑施工费用、型钢的使用费",{"courseImg":13,"courseName":14},"https:\u002F\u002Ftihai-oss-cloud.itihey.com\u002Fimg\u002F3eb406395fe66af1a44c63b498150be2.jpg","建筑工程概预算","插、拔型钢定额按( )考虑",[17,28,37,40,49,58,67,76,85,94],{"answer":18,"createTime":5,"id":19,"options":20,"question":25,"source":26,"type":27},[],999187321,[21,22,23,24],"面积","体积","延长米","不算","楼地面面层割缝、楼梯开防滑槽按设计图示尺寸以( )","v2",0,{"answer":29,"createTime":5,"id":30,"options":31,"question":36,"source":26,"type":27},[],999187408,[32,33,34,35],"用于在估算时不可能明确的潜在项目,包括那些在做成本估算时因为缺乏完整、准确和详细的资料而不能完全预见和不能注明的项目,并且这些项目是必须完成的项目","用于在进行技术设计、施工图设计和施工过程中,在批准的初步设计和概、预算范围内所增加的工程费用","用于由于一般自然灾害所造成的损失和预防自然灾害所采取的措施费用","用于(上级主管部门组织)竣工验收时,验收委员会(验收小组)为鉴定工程质量,必须开挖和修复隐蔽工程的费用","以下关于基本预备费说法错误的是( )",{"answer":38,"createTime":5,"id":6,"options":39,"question":15,"source":26,"type":27},[],[8,9,10,11],{"answer":41,"createTime":5,"id":42,"options":43,"question":48,"source":26,"type":27},[],999187571,[44,45,46,47],"工程师确认,发包方签发工程变更指令","发包方确认,工程师签发工程变更指令","工程师确认并签发工程变更指令","发包方确认并签发工程变更指令","由于工程变更会带来工程造价和工期的变化,为了有效地控制造价,无论哪一方提出工程变更,均需由( )",{"answer":50,"createTime":5,"id":51,"options":52,"question":57,"source":26,"type":27},[],999187664,[53,54,55,56],"非生产性建设项目总投资由固定资产投资和铺底流动资金组成","生产性建设项目总投资包括工程费用、工程建设其他费用和预备费三部分组成","建设投资是为了完成工程项目建设,在建设期内投入且形成现金流出的全部费用","建设投资由固定资产投资和建设期利息组成","关于我国建设项目投资,以下说法正确的是( )",{"answer":59,"createTime":5,"id":60,"options":61,"question":66,"source":26,"type":27},[],999187676,[62,63,64,65],"人工费索赔包括新增加工作内容的人工费,不包括停工损失费","发包人要求承包人提前竣工时,可以补偿承包人利润","工程延期时,保函手续费不应增加","发包人未按约定时间进行付款的,应按银行同期贷款利率支付迟延付款的利息","根据我国现行合同条件,关于索赔计算的说法中,正确的是( )",{"answer":68,"createTime":5,"id":69,"options":70,"question":75,"source":26,"type":27},[],999187700,[71,72,73,74],"按照机械设备台班费计算","按照台班费中的设备使用费计算","自有设备按照台班折旧费、人工费和其他费之和计算","租赁设备按照台班租金计算","当施工机械停工导致费用索赔成立时,台班停滞费用正确的计算方法是( )",{"answer":77,"createTime":5,"id":78,"options":79,"question":84,"source":26,"type":27},[],999187741,[80,81,82,83],"招标公告","技术标准","技术要求","工程量清单","招标人编制招标控制价和投标人编制投标价的重要依据是( )",{"answer":86,"createTime":5,"id":87,"options":88,"question":93,"source":26,"type":27},[],999187869,[89,90,91,92],"地梁(圈梁)","地圈梁构造柱","构造柱","基础砂浆防潮层","砖基础国标清单项目工程量计算不扣除( )",{"answer":95,"createTime":5,"id":96,"options":97,"question":102,"source":26,"type":27},[],999187882,[98,99,100,101],"混凝土梁面凸出宽度大于300mm的单阶线条","混凝土墙面凸出宽度为250mm的单阶线条","砖墙上混凝土窗台板单阶挑沿","女儿墙上混凝土压顶单阶挑沿","下列情形可以计算线条模板增加费的是( )"]