单选题 In a job-order costing system that is based on machine-hours, which of the following formulas is correct
A. Predetermined overhead rate = Actual manufacturing overhead ÷ Actual machine-hours
B. Predetermined overhead rate = Actual manufacturing overhead ÷ Estimated machine-hours
C. Predetermined overhead rate = Estimated manufacturing overhead ÷ Estimated machine-hours
D. Predetermined overhead rate = Estimated manufacturing overhead ÷ Actual machine-hours