题海让大学四年没有难题
白天模式登陆

题目详情

单选题 When the material is likely to accumulate on the track and become an obstacle to the operation, the crane and the lifting trolley running on the track should be installed under its frame ( or end beam ) and under the trolley frame ( )

A. Weight limiter

B. Limit position limiter

C. Buffer

D. Rail cleaning device

桥门式起重机技能操作Bridge and Gantry Crane Skill Operation(Chinese-English)课程封面

学科:桥门式起重机技能操作Bridge and Gantry Crane Skill Operation(Chinese-English)

时间:2024-08-26 12:47:37

Copyright © 2022 津ICP备2021001502号