题目10单选题
Which one of the following statements is incorrect? ( )A. Job costs are collected separately, whereas process costs are averagesB. In job costing, the direct cost of a job can be ascertained from materials requisitions notes and job tickets or time sheetsC. In process costing, information is needed about work passing through a process and work remaining in each processD. In process costing, but not job costing, the cost of normal loss will be incorporated into normal product costs