单选题 下列对双代号网络图绘制规则的描述不正确的是( ).Which of the following descriptions of the drawing rules for the activity-on-arrow network diagram is incorrect? ( )
A. Circulation loops are not allowed
B. Double-headed arrows can appear between nodes
C. Arrows with no nodes at either the arrowhead or tail are not allowed
D. It is preferable to avoid crossing of arrows

学科:Construction Organization and Schedule Management 施工组织与进度管理